Patna Municipal Corporation

India Mayor: Sita Sahu
Summary
  • image description
     
    Population 1684222
  • km 2
    Area 297.9
  • USD
    GDP 2.4 Billion
  • emission
    Targets by N/A N/A
Targets

Targets by Patna Municipal Corporation

Renewable energy target

 

  • The Patna Municipal Corporation committed to increase its Installed capacity of Renewable energy in Local Government to 6 MW by 2022
  • The target is going to be reached by activities in Electricity sector.
Energy efficiency target

 

30% Energy efficiency improvement by 2022

  • The Patna Municipal Corporation committed to increase its energy efficiency in Final energy and Community energy consumption by 30% by 2022 compared to 2017 levels.
  • This target will be achieved in Electricity sectors

 

Actions
Development of Regional Municipal Solid waste to energy(electricity) & Scientific land filling facility in Patna on PPP - Patna Municipal Corporation
  • Start year:
  • Type: Technical / Infrastructural
  • Status: In operation

Bihar Urban infrastructure development Corporation Ltd.(BUIDCO) has initiated the process of a Integrated Solid waste Management process plant at the disposal site. A waste to energy processing plant has been commissioned with Patna Green Energy Pvt Ltd. being the PPP partner. The Patna Green Energy Private Limited, a special purpose vehicle formed for the landfill site project, is already working on the development of the complex, which will have the capacity to generate 10MW of electricity. The project is targeted to be completed in two years. The site has been developed over an area of 74 acres at Ramachak- Bairiya village on the Patna-Gaya road. It can accommodate 1000 tons of garbage per day whereas the average daily garbage generation in Patna is around 800-900 tons

Read More Read Less
Sectors:
  • Waste
Solar Roof top Photo Voltaic on Government Buildings - Patna Municipal Corporation
  • Start year:
  • Type: Technical / Infrastructural
  • Status: In operation

Patna Municipal Corporation has plan to install solar roof top photo voltaic on the government buildings in the city of Patna through Government of India's sponsored Smart City Mission. The total number of government buildings have been identified for this project are 54. There is a potential for Energy Generation of 6.6 MW. The approx capital cost of Project is 99.92 crores INR. Huge Saving in Cost of Power in the long run. Potential for Availing PPP Funding and Govt. Subsidy. Breakeven of Capital Investment in 8 years. Revenue expected after 8 year till 25 years from installation.

Read More Read Less
Sectors:
  • Commercial
Energy Efficienct Street Lighting - Patna Municipal Corporation
  • Start year:
  • Type: Action plan
  • Status: In operation

Patna Municipal Corporation plans to replace conventional street lighting of approx. 15000 poles with LED lights and luminous control connected to integrated command and control centre through Smart City. Rs. 20.00 Cr capital investment with EESL. There will be replacement of 29756 luminaries.

Read More Read Less
Sectors:
  • Commercial
Intelligent Traffic and Transportation Management - Patna Municipal Corporation
  • Start year:
  • Type: Action plan
  • Status: In operation

Reduced traffic congestion and related GHG emissions through installation of intelligent traffic & transportation management and parking management system in areas like Railway Station neighborhood, Gandhi Maidan etc. Improvement of roads, cycle tracks laying, vehicular intersections & pedestrian crossings. Traffic and Transportation Management Centre (Enforcement Automation Centre, Video Analytics Implementation). Variable Messaging System. Public Transport – VTMS, PIS, Depot Development

Read More Read Less
Sectors:
  • Transport
Power for all 24x7 - Patna Municipal Corporation
  • Start year:
  • Type: Technical / Infrastructural
  • Status: In operation

Patna Electricity Supply Undertaking (PESU) has undertaken path-breaking steps in last three years to ensure availability of 24x7 electricity supply through centrally sponsored Integrated Power Development Scheme (IPDS.) This has resulted in reduction of scheduled outages to 1-1.5 hours per month and unscheduled outages to less than 1 hour. Also, T&D Losses has reduced to 28% from 40% between 2012 and 2016. This is due to fresh underground cabling of 33 kV line in select city areas.
The ABD area is catered by South Bihar Power Distribution Company Limited (SBPDCL). Current demand for power in ABD area is 42 MW. The plan is to install 6.6 MW of energy through solar panel installations at 54 identified Government Buildings (Building list is enclosed in Annexure 4, Doc. No. 4.25) using 60% rooftop area. This would meet about 16% of its total current demand in ABD area and would be implemented in hybrid model having both on and off grid system. Apart from the government buildings solar systems would be installed in proposed smart bus stops, e-rickshaws, Multi-modal Hub in Railway Station Area, Bankipur BSRTC-TTMC, and Solar Walkways at Adalatganj Lake Redevelopment.

Read More Read Less
Sectors:
  • Residential
  • Commercial
  • Industrial
Smart Off-street Parking - Patna Municipal Corporation
  • Start year:
  • Type: Technical / Infrastructural
  • Status: In operation

Smart off-street parking is proposed at two locations, i.e., Railway Station Transportation Hub (750 ECS) and Bankipur BSRTC TTMC (700 ECS). It would be integrated with Apna Patna App for providing real time parking information. Facilities like Parking Meters, will be installed at 6 on-street parking locations on pilot basis. Special initiatives are being planned for optimal utilization of multi-level parking adjoining Buddha Jayanti Park (350 ECS). Redevelopment of Railway station area will include: Hawkers Complex (App. 1000 No.s; 20090 sq.m.), Multimodal hub with new Bus stand and auto stand (10046 sq.m.), Private parking (750 ECS), Institutional/ Commercial complex (35161 sq.m.) and Solar Rooftop (12225 sq.m.). Bankipur Intra City Bus Terminal (3600 sq.m. operational area for 50 Buses); Private Parking (700 ECS); Solar Rooftop: 3100 sq.m.)

Read More Read Less
Sectors:
Conservation of Riparian Wetland and Redevelopment of Adalatganj Lake - Patna Municipal Corporation
  • Start year:
  • Type: Action plan
  • Status: In operation

Conservation of Riparian Wetland along Ganges and Redevelopment of Adalatganj Lake in an eco-friendly manner. Native flora will be promoted wherever possible. Plantation will be promoted along the smart road network that will help absorb air pollutants. Conservation of Rpiarian Wetland will cover developement of the natural landscape, Promenade structure (1.5 km), River viewing deck (G+1; 240 sq.m.), Activity Linkage (300 m) and Native flora. Redevelopment of Adalatganj Lake will include 2.47 Acres lake area redevelopment, 300 m of solar footpath and Urban Haat

Read More Read Less
Sectors:
Inventories
Community inventories

GHG emission from Patna Municipal Corporation
GHG inventory in
Government operations inventory

GHG emission from Patna Municipal Corporation
GHG inventory in

Mayor Sita Sahu
Patna Municipal Corporation, India

map

Initiative

Status of compliance

Compact of Mayors
Sign up for our regular Low Carbon City News and get key updates on current developments in local climate action.