Changwon City

Republic of Korea Mayor: Sungmoo Huh
Summary
  • image description
     
    Population 1070199
  • km 2
    Area 747.12
  • USD
    GDP 28 Billion
  • emission
    Targets by N/A N/A
Targets

Targets by Changwon City

There are no targets yet

Actions
GHG Energy Target Management System in Industrial Sector - Changwon City
  • Start year: 2012
  • Type: Regulatory
  • Status: In operation

As a home for machinery industry, city and government tried to reduce emmissions on industrial sectors by building carbon reduction target management system.
There are 27 business units to control by this management system and the reduction target is 10.13% in 2020.

Read More Read Less
Sectors:
local action
CNG fueled public bus and filling stations - Changwon City
  • Start year: 2001
  • Type: Technical/Infrastructure investment
  • Status: In operation

To reduce air pollutions and GHG emissions, city and government tried to replace to CNG fueled public buses and garbage vehicles with filling stations. The CNG bus exchange rate reached 97.2% in 2013 with 724 vehicles.

Read More Read Less
Sectors:
  • Industrial
  • Government Transport
  • Facilities
  • Transport
local action
Switch to LED lightings for Pubic Buildings - Changwon City
  • Start year: 2009
  • Type: Technical/Infrastructure investment
  • Status: In operation

City completed to switch all the lightings in public buildings to LED. More than 3,307 lightings were switched and enhanced as energy efficient electricity consumptions.

Read More Read Less
Sectors:
  • Buildings and Facilities
  • Street Lighting and Traffic Signals
local action
1 million green home project - Changwon City
  • Start year: 2004
  • Type: Policy/Strategies/Action Plans
  • Status: In operation

To expand renewable energy generations in citywide, city and national government have supported private housing to facilitate photovoltaic panals on roofs.
City sets a target to support 1million houses of photovoltaic power generation panals.
As of the end of 2013, there were 5,304 houses equipped with solar panals.

Read More Read Less
Sectors:
  • Residential
  • Buildings
local action
Energy Saving Street Lighting System - Changwon City
  • Start year: 2012
  • Type: Technical/Infrastructure investment
  • Status: In operation

City tried to swich the street lightings to energy efficient LED system by 10% of total street lightings. The number reached 1,520 in 2013. City continuously will install the energy efficient street lightings for 10%(3,340pcs) of total street lightings by 2020.

Read More Read Less
Sectors:
  • Street Lighting and Traffic Signals
local action
Carbon Mileage System - Changwon City
  • Start year: 2009
  • Type: Fiscal / Financial mechanism
  • Status: In operation

Cooperations with a national government, city has promoted this incentive project to reduce carbon consumption at community level.
City reached a target of the citizens participation by 23% with 89,853households in 2013.

Read More Read Less
Sectors:
  • Residential
local action
Earth Hour Campaign - Changwon City
  • Start year: 2009
  • Type: Policy/Strategies/Action Plans
  • Status: In operation

Since 2009, City of Changwon has implemented Campaign of Earth Hour for saving energy by turn-off lightings at buildings and houses with citizens participations. Every year, more than 12% of total city households were participated and reduced 9.7tons of CO2eq of Carbon by 1hour lighting off. By those efforts, city designated 22nd of every month as green days to saving energy day.

Read More Read Less
Sectors:
local action
Solar House Building Project - Changwon City
  • Start year: 2011
  • Type: Policy/Strategies/Action Plans
  • Status: In operation

by excavating the disadvantaged, city has supported them to supply proper renewable energy generating system by facilitating photovoltaic pannels and solar heating boiler systems.

Read More Read Less
Sectors:
  • Residential
local action
Operating Public Bike System - Changwon City
  • Start year: 2012
  • Type: Policy/Strategies/Action Plans
  • Status: In operation

As one of the planned and basin- shaped city, city was introduced Public Bike System on its public transportations in 2012. City operated 6,000 public bikes with 242 stations with 290,000 memberships. In the result, 24% of total citizens posesed their own bicycles.

Read More Read Less
Sectors:
  • Residential
  • Commercial
  • Industrial
  • Government Transport
  • Transport
local action
Low Emission Energy Suppling Policy - Changwon City
  • Start year: 2012
  • Type: Policy/Strategies/Action Plans
  • Status: In operation

As following the clean energy suppling policy, city continuously build infrastructures for supplying clean heating energy for single unit residential areas. In 2012, 13,000 single unit households had benefits of clean energy supplying.

Read More Read Less
Sectors:
  • Residential
  • Facilities
local action
Green Day Campaigne - Changwon City
  • Start year: 2006
  • Type: Education/Awareness Raising
  • Status: In operation

For public awareness and education for climate change and nature conservations, city set green day on every 22nd and campaigne to citizens to save energy and local ecology.

Read More Read Less
Sectors:
  • Residential
  • Commercial
  • Industrial
  • Water and Wastewater (energy only)
10 million trees planting project - Changwon City
  • Start year: 2011
  • Type: Public Participation/Stakeholder engagement
  • Status: In operation

City has set a plan to plant 10 million trees to offset carbon emisssions in 2011. City has planted almost 1million trees every year by public participations and pubic efforts. The end of 2013, the planting reached more than 3million trees within all around the city.

Read More Read Less
Sectors:
  • Residential
  • Agriculture, Forest and Other Land Use (AFOLU)
local action
Integrated Public Transportation Operating System - Changwon City
  • Start year: 2011
  • Type: Technical/Infrastructure investment
  • Status: In operation

To enhance use of public transportation, city and government facilitated customer oriented convenient services such as UTIS and BIS(2,454 spots). And city revised transportation signal system for 215 sites and introduced 735 taxies as branded. For the remoted area, city extended the public bus routes to 68 lines operating with 78 buses.

Read More Read Less
Sectors:
  • Government Transport
  • Transport
local action
Energy Target Management for the Environmental Facilities - Changwon City
  • Start year: 2012
  • Type: Regulatory
  • Status: In operation

There are 13 sites of Environmental Facilities which are managed by 30% energy reduction targets in 2020.
Every facilities should set action and implementation plans to reduce GHG emissions. If the target were not satisfied, the facilities should improve their energy facilities with recommendations.

Read More Read Less
Sectors:
  • Industrial
  • Water and Wastewater (energy only)
local action
Renewable energy generations in Public Sectors - Changwon City
  • Start year: 2012
  • Type: Technical/Infrastructure investment
  • Status: In operation

Using public buildings' rooftops or any similar empty public spaces, city and private businesses tried to build PV power generating facilities.

Read More Read Less
Sectors:
  • Buildings and Facilities
local action
Carbon Energy Target Management Implementations for Public Sector - Changwon City
  • Start year: 2011
  • Type: Regulatory
  • Status: In operation

City designated 86 public buildings to reduce GHG emissions. Once every month, designated 86 public buildings have to put their energy consumptions
on the government carbon information measurment system.
City sets 20% carbon reduction in public buildings energy consumptions through saving office heating and cooling, less use of Elevators, introductions of automatic control equipments in heating and cooling systems.

Read More Read Less
Sectors:
  • Buildings and Facilities
local action
Green Apatment Competition - Changwon City
  • Start year: 2013
  • Type: Public Participation/Stakeholder engagement
  • Status: In operation

To promote the climate change and energy saving policy, city announced the competions to award for the green activities and action plans for low carbon community.
By reducing comsumption of water, gas and electricity of every apartment communities, city can deliver its' citizens the sprit of climate change and practical environmental habits.

Read More Read Less
Sectors:
  • Residential
  • Buildings
local action
Methane Bio Gas Purification Facilities - Changwon City
  • Start year: 2011
  • Type: Public Participation/Stakeholder engagement
  • Status: Completed

To improve renewable energy efficiency from Biogas, city cooperated with Private partnerships built digestion facilities for collecting and purifing Methane gas.
It can produce 8,000 m3 of bio gas per day. The collected and purified gas is supplied for Public Buses.

Read More Read Less
Sectors:
  • Industrial
  • Water and Wastewater (energy only)
local action
EV Distribution Promotion Project - Changwon City
  • Start year: 2011
  • Type: Fiscal / Financial mechanism
  • Status: In operation

To expand low-carbon and energy efficiency policy, city has provided incentives for the citizens who purchase EVs. Not only incentives but also toll and parking expenses had been discounted to promote the use of low carbon and clean energy.
City will provide 200 EVs till the end of 2014. At the end of 2013, There were 81 EVs with 83 electricity charging stations.

Read More Read Less
Sectors:
  • Government Transport
  • Transport
local action
Pilot Distribution of Mini Photovoltaic Power Generation System to be Installed on Apartment Verandas - Changwon City
  • Start year:
  • Type: Public Participation/Stakeholder engagement
  • Status: In operation

Read More Read Less
Sectors:
  • Residential
local action
Carbon Emissions Trading System - Changwon City
  • Start year:
  • Type: Regulatory
  • Status: In operation

For flexible implementation of the Carbon Emissions Trading System in accordance with the national greenhouse gas emission allocation plan to be effectuated nationwide beginning 2015,
◆ this action plan aims to stabilize the implementation of the Emissions Trading Plan for coping with climate change issues and reducing greenhouse gases earlier and make full preparation by establishing internal regulations that help achieve the targeted greenhouse reduction quota per workplace.
◆Expected Effects
◎ Contribution to the early stabilization of the emissions trading plan in the first implementation year 2015.
- Emphasizing the importance and promotion of the emissions trading plan.
◎ Change of awareness regarding energy savings by stimulating competition among places of business.
- Change of awareness and desire to practice by stimulating the competition including penalties per place of business that exceeds permits.
◎ Contribution to the achievement of national target emissions and implementation of climate change adaptation 2030
- Achievement of the goal to reduce emissions by 30% over the greenhouse gas emission estimate in 2030 (BAU).

Read More Read Less
Sectors:
  • Waste
local action
Best Village Building Project - Changwon City
  • Start year:
  • Type: Public Participation/Stakeholder engagement
  • Status:

Best Village Building Project is voluntarily participating programs of Citizens who want to make their communities as green and eco-friendly society. Each local Community sets best village implementing committee consisted of it's residents and discusses what would be a top priority to make it's community as environmentally sound and safe place. Through audit by experts, city can announce the winner with monetary and community award. Since 2010, city identified the environmental issues for each village and induced the solutions from each local community group. They set their own targets to overcome every task.

Read More Read Less
Sectors:
  • Human health
local action
Solar Tower Building - Changwon City
  • Start year: 2007
  • Type: Education/Awareness Raising
  • Status: Completed

City has built an Ocean Solar Tower mounted with PV panals to produce 600kw/h of Electricity. This facility is also famous sight seeing and educational place to learn renewable energy generations.

Read More Read Less
Sectors:
Small Streams Rehebilitation Project - Changwon City
  • Start year: 2012
  • Type: Public Participation/Stakeholder engagement
  • Status: In operation

City has rural areas to provide local food for its citizens. However, by the industrializations, the old only have left in rural areas and they are getting older and older. The lands,fields and stream across the villages were abandened with piles of wastes. Streams were polluted from chemicals and

Read More Read Less
Sectors:
  • Human health
local action
Rain Water Collecting Storages Installation - Changwon City
  • Start year: 2010
  • Type: Policy/Strategies/Action Plans
  • Status: In operation

Since 2010, City established Rainwater Management Ordinance to manage systemetic rainwater collectings. City started to install rainwater storages on public buildings and expanded to private buildings. At present, city has 5 rainwater storages.

Read More Read Less
Sectors:
local action
Green Rooftop Project - Changwon City
  • Start year: 2006
  • Type: Policy/Strategies/Action Plans
  • Status: In operation

Since 2006, City has introduced green rooftop to make much cooler city and more green friendly city with 59 sites of green rooftops. At the initial stage, only public buildings were introduced green roofs. Those areas has been provided the residents comportable resting places.
Other private buildings followed next and expanded whole city area with 50% of monetary incentives.

Read More Read Less
Sectors:
local action
Storm and Flood Disater Prevention - Changwon City
  • Start year: 2005
  • Type: Policy/Strategies/Action Plans
  • Status: In operation

As a coastal and marine city, Changwon has faced storm and flood risk every summer. It has typhoons in summer seasons and disasters resulted huge damages of assets floodings and casualties. City tried to build disaster walls on the edge of flooded area with pumping system and excavated water storages at the flood habitual areas.

Read More Read Less
Sectors:
local action
School Environment Textbook Publishment - Changwon City
  • Start year: 2008
  • Type: Education/Awareness Raising
  • Status: In operation

City has published elementary school textbooks for environment. It was first trial in Korea Municipality to distribute the textbooks to its schools. City suggested that the textbooks could use to mix with school curriculums and experimental activities.
Since 2008, city provided 44,300 environmental textbooks with mindset of edutaiment.

Read More Read Less
Sectors:
local action
Healthy City Project - Changwon City
  • Start year: 2012
  • Type: Policy/Strategies/Action Plans
  • Status: In operation

Cooperations with WHO, city introduced Healthy city project to make more safe and sustainable city. city excavated several health related initiatives such as natural and climate disasters preventions and safe and sound city stretagies for the vulnerable levels of people.

Read More Read Less
Sectors:
  • Human health
local action
Urban Streams Restoration Project - Changwon City
  • Start year: 2007
  • Type: Technical/Infrastructure investment
  • Status: In operation

city has small streams covered with concrete which is used for a parking lots. Under the concrete cover, there were streams polluted from wastes water. Others also badly polluted from the wastes water from adjacent industiral complexes. The smalls of the rivers were disgusting and no living things to survive. city has tried to rehebilitate the streams with ecologically safe and full of Biodiversity places. Since 2007, city with MOE were cooperated together to revitalize the streams. Thanks to the effort from local NGO, city Administrations and MOE, city integrated the works and started.

Read More Read Less
Sectors:
local action
Inventories
Community inventories

GHG emission from Changwon City
GHG inventory in
Government operations inventory

The Changwon City has reported 1 government operational inventory, since 2005. In its latest inventory, compiled in 2005, the are identified as key emission sources.

GHG emission from Changwon City
GHG inventory in 2005

Mayor Sungmoo Huh
Changwon City, Republic of Korea

map

Initiative

EcoMobility Alliance
Compact of Mayors - ICLEI

Status of compliance

Compact of Mayors
Sign up for our regular Low Carbon City News and get key updates on current developments in local climate action.