Special Capital Region of Jakarta
Indonesia

Population: 9988329
Area of jurisdiction: 7639.83 km2

Commitments

  Community Government
Absolute base year GHG reduction target: n/a n/a
Baseline scenario (BAU) GHG reduction target: 30% by 2030 (2005) 30% by 2030 (2005)
Fixed-level GHG reduction target: n/a n/a
Carbon intensity reduction target: n/a n/a
Renewable energy target: n/a 30% by 2030
Energy efficiency target: n/a % by 2030 (2012)
Government and Community: CO2(e) targets

Performance

Community GHG Emissions
Total ( n/a ):  0 tCO2e
Government GHG Emissions
Total ( 2013 ):  0 tCO2e

Other available GHG inventories: 2010

Mitigation actions

Green Building Implementation
Reducing the use of natural resources, reduce emission through building operation, and endorsing local Material (reducing carbon footprint) Start year  
Sector  
Type Policy/Strategies/Action Plans
Status In progress
File  
Installation of Solar Power Plant in Kepulauan Seribu
The development of Solar Power Plant in Kepulauan Seribu with capacity up to 50 KwP. Start year 2012
Sector Residential
Type Technical/Infrastructure investment
Status Completed
File  
Reduce, Reuse and Recycle Center
Development of 3R-Center (Reduce-Reuse-Recycle) in accordance to reduce the burden of Bantar Gebang Landfill. In 2010, 3R-Center could process up to 60.995 ton waste. Start year 2010
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Cakung Recycle and Composting Center
Cakung Center of Recycling and Composting (PDUK) currently operates and will be developed into Intermediate Treatment Facility (ITF). ITF is expected to reduce the burden on Bantar Gebang Landfill. The decision to put the location in Cakung is also expected to reduce the burden of waste transport vehicles and thus reduce the traffic. Based on 2010 data, PDUK Cakung able to process waste as much as 400 tons/ day. Start year 2010
Sector  
Type Public Participation/Stakeholder engagement
Status In progress
File  
Composting center in Bantar Gebang Landfill Area
Government of DKI Jakarta develop a composting center in Bantar Gebang Landfill to exploit the potential compost from organic waste. This program contribute up to 3.867 ton CO2eq emission reduction and capable of processing 60 ton organic waste daily. Start year 2010
Sector Waste
Type Technical/Infrastructure investment
Status Completed
File  
Installaton of gas capture in landfill (waste to energy project)
In 2010, a gas-based power plant is developed in Bantar Gebang Landfill using methan gas produced there as the resource. The gas potential contained in this wastes has the capacity upto 2 MW, producing up to 12.865.695 Kwh energy in 2010. According to 2010 GHG inventory, this program succesfully reduce as much as 9.623,54 ton CO2eq emission. Start year 2010
Sector  
Type Public Participation/Stakeholder engagement
Status In progress
File  
Bus Rapid Transporation
The development of BRT begun in 2010 by the bus procurements which targeted to be done in 2014. According to GHG inventory data in 2010, BRT program contributes 62% from total mitigation in 2010, with as much as 92,85 gigagram CO2eq or 86.937.448 passengers in total. This number is the accumulation from the Jakarta switch of transport mode: 10,34% from private cars, 29,94% from motorcycle, 5,3% from taxi, 4,33 % from big bus, 39,53% from mini bus, and 15,56 from other transportation mode. Start year 2010
Sector Transport
Type Technical/Infrastructure investment
Status In progress
File  
Solar Powered of State Owned School Building
The development of Solar Power Plant for energy supply to schools in Jakarta has begun in 2013 with capacity 40 KwP. This target will be improved by adding two more locations with capacity 20 KwP each, in 2015. Start year 2013
Sector Commercial
Type Technical/Infrastructure investment
Status In progress
File  
Solar Powered of Jakarta Government Building (in Central Jakarta)
solar panel installation to meet the energy needs of government building and operation with capacityup to 15 kWp Start year 2012
Sector  
Type Technical/Infrastructure investment
Status Completed
File  
Installation of solar power street lighting
The installation of solar power street lighting will be done in 2010 to 2012, with as much as 36,4 KwP production capacity target in 2012. According to 2010 emission inventory, CO2eq mitigation from this action reach 6,8 ton CO2eq or contribute as much as 0,0003 from total emission reduction target from the overal mitigation action in 2010. Start year  
Sector  
Type Technical/Infrastructure investment
Status Completed
File  

Adaptation actions

Expanding urban forest area
Expanding forest area project including maintenance and land acquisation to be reforested. The project also consider the reforestation of mangrove tree in coastal area in north Jakarta as natural barier for sea abrasion Start year 2012
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Kampung Deret (Structuring and renovating slum area)
Kampung Deret Program is one of main program of DKI Jakarta administration under Mr. Joko Widodo (now elected president of Indonesia). It is also one of his campaign promise, that he will restructuring slum area and renovating housing there so it become more liveable and sustainable. Before the initaitive had been launched, slum area not only deteriorate the image of Jakarta as National Capital but also become threat to public health since the sanitation sysytem not functioning well there. Most of slum area also located near the river side, so it's also becomo one factor that causing flood in Jakarta. Start year 2012
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
The Project for Capacity Development of Watsewater Sector Through Reviewing the Wastewater Management Masterplan in DKI Jakarta
The vision of new masterplan for improvement of wastewater management in DKI Jakarta is to create sustainable water cycling society in DKI jakarta. The masterplan will improve the current river water quality up to the levet that river water can be used as water sources for water supply system in DKI Jakart by the year 2050. The reason behind creating new masterplan are: 1. Development of sewerage system couldn't proceed as planned and the coverage remains as low as than2 % 2. More than 90% of the domestic wastewater is currently being discharged into public bodies (rovers and sea) or underground through septic tanks without treatment 3. Ppoor water quality of the surface water 4. Sewerage facilities such as wastewater treatment plants require relatively large area to connstruct treatment facilities Start year 2012
Sector  
Type Assessment/Research
Status Completed
File  
National Capital Integrated Coastal Development
NCDC firstly known as Jakarta Coastal Development Strategy/ JCDS (2007-2011) was a response over the major flood that struck DKI Jakarta in 2007. In 2013, JCDS turned into NCDC with the primary purpose to provide long-term protection to Jakarta againts the flood threat coming from water system (sea and river). NCDC produces coastal area development plan that is divided into 3 stages: 1. Phase A (2014-2018) : Escalating the dyke along the coast 2. Phase B (2016-2022) : Development of western offshore seawall and retention reservoir, water supply pipe, Banjir Kanal Timur diversion, and implementating sanitation plan in the western part of Jakarta. 3. Phase C (2030-2040) : Development of eastern offshore seawall and retention reservoir, as well as implementating sanitation plan in the eastern part of Jakarta. Some environmental groups are having concern with the coastal area and give notes to this masterplan. Start year 2014
Sector  
Type Policy/Strategies/Action Plans
Status In progress
File download
Land Inventory and buying land surronding dam installation
Office of Public Works Start year  
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Development of new dam (water retentiuon facilities) surrounding Jakarta area
Establishment of new dam inn Cilangkap, Marunda, Setu, Sunter, Hulu Pondok Rangon, and Brigif Start year 2013
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Maintenance of flood controlling facilities
maintenance of facilities and dranage system in Jakarta as a way to control flood Start year 2013
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Improvement of facilities in BKT corridor
  Start year 2013
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Instalation pf Sheet Pile and Pump in Muara Angke
Implementation of the installation of sheet pile Start year 2013
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Installation of longstorage and new pump for flood control in Koja, North Jakarta
  Start year 2013
Sector  
Type Technical/Infrastructure investment
Status Completed
File