Bogor City Governemnt
Indonesia

Population: 1039465
Area of jurisdiction: 118.5 km2

Commitments

  Community Government
Absolute base year GHG reduction target: n/a n/a
Baseline scenario (BAU) GHG reduction target: n/a 33% by 2020 (2010)
Fixed-level GHG reduction target: n/a n/a
Carbon intensity reduction target: n/a n/a
Renewable energy target: n/a 20% by 2014
Energy efficiency target: n/a % by ()
Government and Community: CO2(e) targets

Performance

Community GHG Emissions
Total ( n/a ):  0 tCO2e
Government GHG Emissions
Total ( 2015 ):  0 tCO2e

Mitigation actions

NAMA SUTRI NATIONALLY APPROPRIATE MITIGATION AGTION Sustainable Tranportation
Implementation of transportation pilot projects ispecifically on: investment bus fleet , increasing public transport corridors , parking management , pedestrian infrastructure. In other hand, Implement Monitoring Report and Verification ( MRV ) systematic for the monitoring and evaluation of urban transport development Start year  
Sector Transport
Type Policy/Strategies/Action Plans
Status Looking for Funding
File  
Transport Demand Management
Grouping of public transportation (angkutan kota/angkot) operated in Bogor City area. By this activity angkit owner can only operated on shcedulle that already decided by bogor government. This activity aim to solve the traffic jam problem that cause by so many angkot operated on the road. Start year  
Sector Transport
Type Policy/Strategies/Action Plans
Status In progress
File  
Installation of integrategd community sanitation facilities (waste to energy initiatives)
The main output from this activity is to create a comunal sanitation system and integrated comunal septictank so it can produce methane (CH4) that can be utilized for energy prom biodigesting process. Main budget for this activity came from national government (ministry of infrastructure), meanwhile bogor government contribute to facilitate pipe from biodigester unit to public house. On 2013 there is 43 installation that had been buil. Start year 2014
Sector Waste
Type Technical/Infrastructure investment
Status In progress
File  
Trans Pakuan (BRT System)
The development of the Bus Rapid Transit (BRT) aims to reduce greenhouse gas (GHG) emissions for climate change mitigation. Successful implementation of this project can lead to reduced congestion, which can increase overall productivity of the city, leading to economic advancements. There are also health benefits resulting from the reduced pollution of better flowing traffic. Start year 2010
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Smart street lighting system
189 unit street lighting already converted to LED in 2014. Bogor administration targeting on 2019 that all street lighting (total: 10.736 unit, including 2000 unit in main road) will be converted from bulb to LED. On 2014 only 200 unit of street lighting that already converted from bulb to LED. it's estimated that realization of this program is only 100 unit of street lighting that will be converted from bulb to LED per year. So it's need another resource of funding to accelerate the program and achieve the traget on 2019 Start year 2014
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Converting Kerosene Based Public Transportation to Gas Based (gasification of angkutan kota in Bogor)
Shifting from kerosene to gas is a way to reduce CO2 emission. city of bogor targeted that on 2016, all public trasportation in Bogor already use gas. 50 converter unit already pass to public transporation owner, and on previous administration there is 1000 converter unit that already pass. But the program not sucessuf because no gas station build. Start year 2013
Sector  
Type Technical/Infrastructure investment
Status In progress
File  
Converting Kerosene Based Public Transportation to Gas Based (gasification of angkutan kota in Bogor)
Shifting from kerosene to gas is a way to reduce CO2 emission. city of bogor targeted that on 2016, all public trasportation in Bogor already use gas. 50 converter unit already pass to public transporation owner, and on previous administration there is 1000 converter unit that already pass. But the program not sucessuf because no gas station build. Start year 2014
Sector Transport
Type Technical/Infrastructure investment
Status In progress
File  
Car Free Day
- Start year  
Sector Transport
Type Education/Awareness Raising
Status  
File download
Pedestrian
Targeting 22 kilometers of pedestrian which will be built through 19-stages from 2012 - 2020. This pedestrian will be equipped with tag tile, bicycle line, and green area. The whole route of oedestrian will be integrated with other public transportation stations and public places. Start year  
Sector Transport
Type Technical/Infrastructure investment
Status In progress
File download
Trans Pakuan
Regional government support the use of public transportation by using used cooking oil for biofuel. The mixture of biofuel is 20% of used cooking oil from crude palm oil and 80% of diesel. The eco-friendly bus, Trans Pakuan, is projected to substitute the use of private vehicles and angkot (14-seats public transportation). This Trans Pakuan bus can accommodate up to 40 persons. Start year 2010
Sector Transport
Type Technical/Infrastructure investment
Status In progress
File download

Adaptation actions

Pedestrian and bicycle line
To achieve eco-mobility by 20 % including walking and bicycle Start year 2012
Sector Transportation systems
Type Technical/Infrastructure investment
Status Completed
File